California High-Speed Rail
Construction Package 1
Project Details
ROLE
Electrical Contractor
CONTRACT AMOUNT
$113 Million
OWNER
California High-Speed Rail Authority
LOCATION
Madera, CA to Fresno, CA
ARCHITECT
Parsons Transportation Group Inc.
SIZE
29 Miles
COMPLETION
2021
Project Description
The California High-Speed Rail Authority’s Construction Package 1 (CP 1) is the first significant construction contract executed on the Initial Operating Section of the high-speed rail project in California’s Central Valley. The CP1 construction area is a 32-mile stretch between Avenue 19 in Madera County to East American Avenue in Fresno County, including major work elements in downtown Fresno. It includes 12 roadway/railroad grade separations, two mainline viaducts, one tunnel, realignments of existing railroad tracks, utility relocations, roadway relocations, two trench sections, and a major river crossing over the San Joaquin River.